close window |
| Total EVAs: | 2 | ||
| Total EVA time: | 11h 38m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 09.06.2023 | S. Bowen | 6h 03m |
They installed an upgraded iROSA (International
Space Station Roll-Out Solar Array) on the 1A power channel on the starboard
truss of the station. |
| 2 | 15.06.2023 | S. Bowen | 5h 35m |
They installed an iROSA on the 1B power channel
on the starboard truss. |