close window

Robert Shane Kimbrough

 Total EVAs:  9
 Total EVA time:  59h 28m

No. Date Together with Time Main tasks and notes
 1  20.11.2008  H. Stefanyshyn-Piper  6h 45m
Relocating two equipment carts, setting the stage for the installation of the starboard S6 truss. They also lubricated the end effector of the Canadarm2. They also continued lubricating the starboard SARJ and replacing trundle bearings.
 2  24.11.2008  S. Bowen  6h 07m
Kimbrough lubricated the port SARJ, while Bowen reinstalled the thermal insulation covers on Kibo. He then installed two GPS antennas on Kibo's logistics module, while Kimbrough installed a new TV camera on the truss.
 3  06.01.2017  P. Whitson  6h 32m
The astronauts installed adapter plates and hooked up electrical connections for three of six new lithium-ion batteries.
 4  13.01.2017  T. Pesquet  5h 58m
The astronauts installed adapter plates and hooked up electrical connections for the final three of six new lithium-ion batteries .
 5  24.03.2017  T. Pesquet  6h 34m
Main objective was to prepare the PMA-3 for installation of the second IDA. They disconnected cables and electrical connections on PMA-3 to prepare for its robotic move.
 6  30.03.2017  P. Whitson  7h 04m
This spacewalk featured the astronauts reconnecting cables and electrical connections on PMA-3 at its new home on top Harmony.
 7  16.06.2021  T. Pesquet  7h 15m
They installed the first array on the far end of the left (port) side of the station's backbone truss structure (P6) to upgrade the 2B power channel.
 8  20.06.2021  T. Pesquet  6h 28m
The duo worked on the far end of the P6 to unroll the first of two iROSAs that will augment power capability for the port 6 truss' 2B power channel.
 9  25.06.2021  T. Pesquet  6h 45m
The spacewalkers installed the second solar array to upgrade the 4B power channel on the P6 truss.