close window |
Total EVAs: | 9 | ||
Total EVA time: | 59h 28m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 20.11.2008 | H. Stefanyshyn-Piper | 6h 45m |
Relocating two equipment carts, setting the
stage for the installation of the starboard S6 truss. They also lubricated the
end effector of the Canadarm2. They also continued lubricating the starboard
SARJ and replacing trundle bearings. |
2 | 24.11.2008 | S. Bowen | 6h 07m | |
3 | 06.01.2017 | P. Whitson | 6h 32m |
The astronauts installed adapter plates and
hooked up electrical connections for three of six new lithium-ion batteries.
|
4 | 13.01.2017 | T. Pesquet | 5h 58m |
The astronauts installed adapter plates and
hooked up electrical connections for the final three of six new lithium-ion
batteries . |
5 | 24.03.2017 | T. Pesquet | 6h 34m | |
6 | 30.03.2017 | P. Whitson | 7h 04m |
This spacewalk featured the astronauts
reconnecting cables and electrical connections on
PMA-3 at its new home on top Harmony. |
7 | 16.06.2021 | T. Pesquet | 7h 15m |
They installed the first array on the far end of
the left (port) side of the station's backbone truss structure (P6) to upgrade
the 2B power channel. |
8 | 20.06.2021 | T. Pesquet | 6h 28m |
The duo worked on the far end of the P6 to
unroll the first of two iROSAs that will augment power capability for the port
6 truss' 2B power channel. |
9 | 25.06.2021 | T. Pesquet | 6h 45m |
The spacewalkers installed the second solar
array to upgrade the 4B power channel on the P6 truss. |