Andrew Richard Morgan

 Total EVAs:  7
 Total EVA time:  45h 48m

No. Date Together with Time Main tasks and notes
 1  21.08.2019  N. Hague  6h 32m
The duo assisted in the installation of International Docking Adapter-3 (IDA-3) to Pressurized Mating Adapter-3 on the space-facing side of the station's Harmony module.
 2  06.10.2019  C. Koch  7h 01m
It was the first in a series of spacewalks dedicated to replacing batteries on the far end of the station's port truss. The existing nickel-hydrogen batteries were upgraded with newer, more powerful lithium-ion batteries.
 3  11.10.2019  C. Koch  6h 45m
The duo continued to replace nickel-hydrogen batteries with more powerful lithium-ion batteries (working site: P6 Channel 2B battery R&R A-F).
 4  15.11.2019  L. Parmitano  6h 39m
It was the first in a series of complex spacewalks in November and December 2019 to repair the Alpha Magnetic Spectrometer (AMS-02), They set up tools and equipment before removing a protective debris shield from the AMS-02.
 5  22.11.2019  L. Parmitano  6h 33m
They continued their work to replace a cooling system and fixed a coolant leak on AMS-02. Luca Parmitano and Andrew Morgan cut and label stainless steel tubes, of which there are eight.
 6  02.12.2019  L. Parmitano  6h 02m
Main task was to install a new pump module. The astronauts installed a bypass to the old thermal control system by attaching a new one off the side of AMS-02.
 7  25.01.2020  L. Parmitano  6h 16m
The main task was to carry out leak checks, make adjustments and then to re-installed insulation on AMS-02.