close window |
Total EVAs: | 2 | ||
Total EVA time: | 14h 07m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 13.04.2002 | J. Ross | 7h 30m |
Mounting two large tripod legs of the truss to
the Destiny Laboratory |
2 | 16.04.2002 | J. Ross | 6h 37m |
Installing a ladder, testing electrical switches
for upcoming truss expansion and attaching external light and equipment to be
used in future assembly work |