close window

Steven Ray "Swanny" Swanson

 Total EVAs:  5
 Total EVA time:  27h 58m

No. Date Together with Time Main tasks and notes
 1  13.06.2007  P. Forrester  7h 16m
Continuing the activation of the S3/S4 and assist in the retraction of the starboard solar array on the Port 6 (P6) truss
 2  17.06.2007  P. Forrester  6h 29m
Final work to activate the Solar Alpha Rotary Joint (SARJ)
 3  19.03.2009  R. Arnold  6h 07m
After Canadarm2 released S6, the spacewalkers plugged in power and data cables to connect the new hardware and remove launch restraints from the photovoltaic radiator and the boxes containing the new solar arrays.
 4  21.03.2009  J. Acaba  6h 30m
First task was to prepare a worksite for new batteries that will be brought up on the STS-127 mission. They also installed a Global Positioning System antenna on the pressurized logistics module attached to the Kibo laboratory.
 5  23.04.2014  R. Mastracchio  1h 36m
The astronauts replaced a backup multiplexer-demultiplexer (MDM) that failed during routine testing April 11, 2014.