close window |
Total EVAs: | 5 | ||
Total EVA time: | 31h 02m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 15.10.2014 | R. Wiseman | 6h 34m |
They replaced a sequential shunt unit
electronics box, a voltage regulator. |
2 | 21.02.2015 | T. Virts | 6h 41m |
The astronauts started routing cables for the
International Docking Adapter (IDA). |
3 | 25.02.2015 | T. Virts | 6h 43m |
The astronauts unfurled and hooked up two more
long cables and Terry Virts lubricated the grapple fixture on the end of the
space station's robot arm (SSRMS). |
4 | 01.03.2015 | T. Virts | 5h 38m |
They installed new antennas and cabling needed
for communications between the station and commercial crew capsules bound for,
or departing from, the new docking adapters. |
5 | 30.01.2025 | S. Williams | 5h 26m |
They removed a radio frequency group antenna
assembly from the station's truss, collected samples of surface material for
analysis from the Destiny laboratory and the Quest airlock , and prepared a
spare elbow joint for the Canadarm2 |