close window

Luca Salvo Parmitano

 Total EVAs:  6
 Total EVA time:  33h 09m

No. Date Together with Time Main tasks and notes
 1  09.07.2013  C. Cassidy  6h 07m
The astronauts replaced a space-to-ground communications receiver and wireless video equipment and installed power and cables for a Russian multipurpose laboratory module.
 2  16.07.2013  C. Cassidy  1h 32m
The spacewalk was terminated after just one hour due to an unexplained build up of water inside the space suit helmet of Luca Parmitano.
 3  15.11.2019  A. Morgan  6h 39m
It was the first in a series of complex spacewalks in November and December 2019 to repair the Alpha Magnetic Spectrometer (AMS-02), They set up tools and equipment before removing a protective debris shield from the AMS-02.
 4  22.11.2019  A. Morgan  6h 33m
They continued their work to replace a cooling system and fixed a coolant leak on AMS-02. Luca Parmitano and Andrew Morgan cut and label stainless steel tubes, of which there are eight.
 5  02.12.2019  A. Morgan  6h 02m
Main task was to install a new pump module. The astronauts installed a bypass to the old thermal control system by attaching a new one off the side of AMS-02.
 6  25.01.2020  A. Morgan  6h 16m
The main task was to carry out leak checks, make adjustments and then to re-installed insulation on AMS-02.